Cedar & Vine — Restaurant TI

Portland, OR · IBC 2021

Findings

Height & Area
3
Occupancy Separation
3
Fire Resistance
1
Occupant Load
6
Egress Capacity
3
Exit Count
3
Common Path
1
Travel Distance
2
Corridor Rating
1
Dining RoomA-2 · 2760 sfBar / StandingA-2 · 640 sfPrep AreaA-2 · 520 sfKitchenA-2 · 1360 sfDry StorageS-1 · 560 sfManager OfficeB · 480 sf1841283572472"36"34"168 ft262 ft64 ft
EVIDENCE · Sheet A2.1 · IBC 504.3 · region [40,40]
7 ft
1/8" = 1'-0"
overlays live
A-2 assemblyB businessM mercantileS-1 storageegress pathoccupant load
1 / 23

Group A-2 / Type V-B — allowable height & area

IBC 504.3IBC 2021
Pass
Measured1 stories (max 2) · 6320 sq ft/story (max 24000)
RequirementBuilding height, stories, and per-story area must not exceed Type V-B limits.
Derivation

Type V-B, Group A-2: max 2 stories, 24000 sq ft/story, 60 ft.

Adopted code text
The height of buildings, in feet, shall not exceed the limits specified in Table 504.3 based on the type of construction and occupancy classification.
Sheet A2.1High confidence · 92%