Capitol Hill Office Fit-Out

Seattle, WA · IBC 2021

Findings

Height & Area
1
Fire Resistance
1
Occupant Load
6
Egress Capacity
3
Exit Count
1
Common Path
1
Travel Distance
2
Corridor Rating
1
Dining RoomA-2 · 2760 sfBar / StandingA-2 · 640 sfPrep AreaA-2 · 520 sfKitchenA-2 · 1360 sfDry StorageS-1 · 560 sfManager OfficeB · 480 sf1841283572472"36"34"168 ft262 ft64 ft
EVIDENCE · Sheet A2.1 · IBC Table 601 · region [40,500]
7 ft
1/8" = 1'-0"
overlays live
A-2 assemblyB businessM mercantileS-1 storageegress pathoccupant load
2 / 16

Primary structural frame — Type III-B

IBC Table 601IBC 2021
Pass
Measured0 hr required
RequirementPrimary structural frame fire-resistance rating for the construction type.
Derivation

Type III-B primary structural frame = 0 hr per Table 601.

Adopted code text
Building elements shall have a fire-resistance rating not less than that specified in Table 601 based on the type of construction.
Sheet A2.1High confidence · 95%